MX's dedicated research and development team is committed to continuous groundbreaking exploration in the field of air distribution, making quality, service and innovation the industry leader. Professional and continuously growing team, high level of innovative production and high flexibility to ensure the shortest production cycle and provide the most comprehensive quality assurance system to meet customer needs.
In the air distribution pipe system, the straight pipe section is connected with each other and the components and components by zipper.
Usually in the project, the installation period is affected by the installation height, installation method, building type, construction time (day or night), working surface, site conditions and other conditions, and the installation cycle is different. However, the basic time is mainly related to the length and number of air ducts. Under normal conditions, two construction personnel can install an air duct of 200M length in one day.
The air distribution pipe system has a special fabric inlet part connected with the iron sheet or metal air cabinet, and the installation only needs to insert the inlet into the iron sheet air pipe connection part and fix it by tying a tight belt.
The air distribution pipe system can solve the problem of vertical pipe installation, that is, if both ends of the vertical pipe are connected with other air pipe systems, only the tension ring is needed at both ends, and if only one end of the vertical pipe is connected with the pipe, it is necessary to use the tension ring to pull the steel rope to fix the building structure.
The air duct system can be properly squeezed, but it will affect the overall aesthetics. When being squeezed, the pipe will become flat at the squeezed place, but it can still keep the cross-sectional area of the air pipe unchanged, and the various air supply performance will not have much impact. Under normal circumstances, the extrusion height can not exceed 1/3 of the diameter of the pipe. More than 1/3 May affect the flow direction of the air in the pipe. When the wind speed in the pipe is high, the pipe has the risk of jitter, so it is best to use elbows or other components to avoid obstacles when arranging the pipe.
Professional installation can ensure the performance of the system, life and the beauty of the entire system, which is the necessary guarantee for the final system quality. Professional debugging can make up for the problems caused by changes in the original design and the actual situation on the site.